Sketching Study Area
Two Reference stations
AM9 and AM2
Six control stations
P1-P2-P3-P4-P5-AM9
Assigning Reference
And Control Stations
Closed Traverse Surveying Method
Applying Closed Traverse Method on six stations, starting and ending at AM9 station
Measuring The Angels
Instruments
Totalstation device
Reflector
Tripod stand
Procedure
Measuring all angles twice:
once with face left and once with face right of the Totalstation
Travers Coordinates
And Correction
Travers Coordinates
Horizontal and Length Error
Corrected Angles
Azimuth Calculations
Initial Coordinates
Corrected Coordinates
Levelling
Instruments

Auto Level

Tripod Stand

Levelling Staff

Procedure
Back sight and foresight distances were approximated to be equal to avoid any errors
Levelling Correction
Levelling Correction
Hight Correction
Initial Elevation
Elevation Correction
Corrected Coordinates
GPS Observations Comparing
Choosing Point 4 and Point 5
to compare its coordinates.

Point 4 shows a small difference in x and y but it’s high in the elevation.

Point 5 shows a very bad deference especially in the X value (expected because it is located nearby the building of College of Engineering).

Points Observations
Measuring coordinates (x, y, z) of all the features (tress, streetlights, etc)

Total number of observations is 356.
Processing Data
Using LISCAD 2018 S.E.E. to Process the points (linking the points with lines and curves and applying the counter model).

Using AutoCAD to make some enhancement (changing colours and fonts, etc) and to add some map features (a legend and a north arrow, etc).

Final Product
Eng. FAHD NASSER ALDOSARI
Teamwork